ELEVO gets new road infrastructure in Brazil
The project consists of 15.8 kilometres of paved
road between the border states of Rio Grande do Sul and Santa Catarina and Praia
Grande city limits, including the
construction of a 316.5 m-long
viaduct.
With an expected beginning in September,
the work will be performed within 27 months.
In the Brazilian market since 2009, the group consolidates its
presence with another contract for
road segment.
Characterization of the works:
• Earthworks: 44.680,00m3;
• Structure of
the pavement: Hard Floor: Sub-base in rolled concrete with 10cm thick
concrete and plate
with 18cm thick - 13.250,00m3;
• Flexible Floor: Base graded gravel
with 18cm thickness
and coating CAUQ (machined hot asphaltic
concrete) with 5cm
thickness - 2.410,00Ton;
• Drainage: Surface drainage: 21.620,00m / Deep
drainage: 11.361,00m;
• Signaling;
• Artwork: Viaduct
with a total length of 316,53m.