Alto Rabagão Water treatment plant
Water treatment plant with an
828 m3/h production.
Construction of raft with
metallic structure, with integrated lifting station ready for a 230 l/s flow
and maximum manometric head of 65 m.
Location: Montalegre
Country: Portugal
Year Completed: 2008