Cambambe Tunnel
Project: "Cambambe Hydroelectric Plant"
Owner: Odebrecht
Client: Tecnasol Angola
Year: 2013
Description: Excavation of the Lateral Spillway Drainage Gallery, circa 400 m long with a cross-section of 9 m2. Excavation is performed with the aid of explosives supported by sprayed concrete and rock bolts.