Douro Interior Subconcession
Lot 4 - Subsection Longroiva / Trancoso. Construction of the connecting portion to the extent of 22.9 km, average width of 12.5 m and a 1x2 platform.Lot 5 - Subsection Trancoso / Celorico da Beira. Construction of the connecting portion to the extent of 18.1 km with an average width of 23.6 m and a 2x2 platform. Earthworks, drainage, paving, ancillary works, signaling and safety.
Location: Trancoso
Country: Portugal
Year Completed: 2011