ELEVO builds a HOTEL in Maputo
2014-08-24
Last 18th August ELEVO
Engineering signed the contract for the
design-building of the foundations
and structure of an aparthotel in
Maputo.
With a total construction area of about 8500 m2
the building consists of 17 floors and one
underground floor for parking.
Located in one of the main avenues in Maputo, the hotel, with 104 rooms, will be
built within 9 months.