Sines Tunnel
Project: "Sines Terminal Expansion Project"
Owner: REN ATLÃNTICO
Client: Somague Engenharia, SA
Year: 2009
Description: Execution of a 857 m tunnel for LPG tank cooling water removal. Having a cross-section of 3.50 m x 2.80 m (height x width), it was performed with the aid of explosives and excavated by a mechanical robotic process.